The Energy Commission has developed the;

  •  Renewable Energy Sub-Code for Transmission and Distribution Networks.

The two Renewable Energy Sub-Codes propose minimum technical connection and performance requirements that a Variable Renewable Power Plant (VRPP) needs to comply with in order to connect its generating facility to the National Interconnected Transmission System (NITS) or a Distribution Network in Ghana, and defines rules and standards to guide the network operators when connecting a VRPP to its Network.


Click here for Renewable Energy Sub-Code for Transmission System (NITS)


Click here for Renewable Energy Sub-Code for Distribution Network


  •  Net Metering Sub-Code for connecting Renewable Energy Generating Systems to the Distribution System..

The Net Metering Sub-Code for connecting Renewable Energy Generating Systems to the Distribution System provides for guidelines and technical connection conditions for the inter-connection of renewable energy generating facility to the low voltage distribution system under the net metering scheme.


Click here for Net Metering Sub-Code

Recent Post

Application Form for Rooftop Solar Programme Residential

APPLY ONLINE NOW ENERGY COMMIS...

Energy Efficiency Project saves 400 gigawatts of electricity

The Energy Efficiency Projects...

  Companies in renewable energy require registration - Energy Commission

He said besides being mandato...

Style Switcher

Layout Style

Predefined Colors

Background Image